Hi Ben,Ed,
Yes will be adding the sump clearance in and internally bracing as well as fully plating the base of the member right up to the coil spring holes.
I have quite a few pictures of front ends that clearly show the width of the sump cutout and depth of it (also with an engine in place) but no real clear pictures of the position of the engine mounts so I suppose I am after 100% confirmation of where the correct position of should be. (don't have a trial engine available yet)
The welds look a bit sus on the engine mounts from being previously moved so may end up cutting them off and making some other ones out of material a bit heavier.
Have already welded on reinforcing bars to both of the lower control arms so that part is out of the way.
Am in Melbourne's West, does anyone have any clear pictures of their front end or do you have one either out of car or installed in one that I could have a look see??
Think CRS was about the $650 mark for a change over front end so this bit of mucking around is worth it.
Cheers M