here are a few images from work on ute. found a few surprises (rust or holes covered by fibreglass) depending on how you look at it. work done so far.....
hr disc front end
new mounts for trimatic(instead of metal plates bolted through floor.)
auto tunnel(instead of i dont know what you call it)
186 bored to 60 thou(still not together)
trimatic done up shift kit etc
head work done double valve spings oversized valves
fuel tank being repaired to original condition
more photos to follow
bike018.jpg[/IMG]