News:

Are you a member of one of the FE-FC Holden Car Clubs of Australia ? If you are, get access to the Club-Member-only area of this discussion board. Send an IM to the board admin, including your real name and club to get access.

Main Menu

NEW PROJECT FC UTE

Started by Mal W, March 10, 2020, 09:41:22 PM

Previous topic - Next topic

KFV888

beautiful job on pipes... awesome build, the only thing i would change in this build is i would have fitted a 350 alloy headed TPI out of a corvette.. but nevertheless, magnificent
i for one salute you

DJ

What a test of patience! Good on you for sticking with it & producing such a result.
Dave
0417 270 315

camxsmith

Great work, that does look like one prick of a job to do..

Errol62

Yep. Very clever work. I detest the guard dump headers. Bloody tight where the steering goes through. One guy on the fb ek site managed to mix and match cast headers and get them to fit but this was a 253 and a real factory look. Your ute will be very different. Thanks for posting and keep the updates coming Malcolm. Very inspiring.


Sent from my iPad using Tapatalk

Mal W

Thanks guys, there was no way I was going to put the pipes through the inner guards as I’m no a fan of that either.


Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

Mal W

Picked up the new wheels today. Couldn’t be happier with the choice and fit







If the frond discs were 3 mm bigger they wouldn’t have fitted.









15 x 6 on front and 15 x 10 on the back


Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

FireKraka

Cool as Mal, please keep the photos coming as I'm really enjoying this build of yours.
Neil

camxsmith

Smokin  Love the look the rims, especially the rear with the deep dish, Nice work.

Mal W

Next I started on the fitting of the radiator. Was planning on using the original VT Commodore radiator but it just turned out to be to tall for where I wanted to fi it. So I’ve ordered one from the USA that will fit with a little less cutting up.
Same as this but complete with fans and shroud



So while I’m waiting on the radiator to turn up I started on putting some of the floor back in



Started with boxing in the front main cross member.




Then I fitted the front section of both floor pans





Next I got the transmission tunnel cut ready to fit







Currently getting the Tailshafts tunnel rolled up.


Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

Errol62

I like your methodology malcolm👍


Sent from my iPad using Tapatalk

my8thholden

wish I had those skills to custom fabricate stuff ...Vern ...
these days i'm half as good for twice as long

Mal W

Still jumping from job to job.
Started on the sills, cut off both sills and cleaned up the inner sills




Had to do a repair on the back of the drivers sill





With the sills I’m doing the same as the FB EK utes with putting an intermediate support panel in between the inner and outer sill for extra strength
















Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

ardiesse

Mal,

Not bloody bad at all.  Tell me - when putting the outer sill on, did you overhead-weld all the plug welds?  Because it looks like you can't tip the body shell over.

Rob
Remember: if your Holden's not leaking oil, it doesn't have any.

Mal W

Hey Rob, yes and I really hate welding upside down....

Don't know how many times I've set myself on fire.
Malcolm WHITTAKER

FireKraka

Hey Mal
Fantastic work as always mate, looks like the Ute was in pretty good shape even though you had to take the whole floor out; the bottom of the 'A' pillars and the inner sills all look really good.
I like the fact that you kept the seam between the 'B' pillar and the wheel arch and the outer sill, you can always tell when this area has been repaired as most just weld up and lose the seam.
I did the same with my EK Ute and made sure the seam stayed.
The 'D' bar for your steering seems pretty close to the head mate are you going to have enough clearnace for engine rock under acceleration I wonder??
As I said before great work and this is going to be a great looking Ute Mal.

Mal W

Just a quick update, have finished the both sills now.
Same as the other side, I’ve fitted an intermediate strengthening panel inside the sills










Bit of rust to repair on the rear quarter panel also



Just have to put a new panel into the lower rear quarter panel to sill area.

Next ive cut and trial fitted the trans tunnel and tailshaft tunnel









Not going to weld it in yet until I get the shifter and handbrake as they both fit onto the gearbox and they will be easier to fit to start with, without the trans tunnel in.

Tomorrow I’ll start on cutting in the floor pans.


Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

Mal W

Ended up making new engine mounts, the standard ones were just way to much messing around to change






Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

Mal W

My version of tough mounts


Sent from my iPhone using Tapatalk
Malcolm WHITTAKER

ehefiv8

Hi, excellent work on your project. The radiator you have ordered, is that a standard size they sell?. Do you have a part number?. Thanks Scott

Errol62

Thanks for the update Malcolm. Magnificent work!
Cheers
Clay


Sent from my iPad using Tapatalk